OceanaGold Corporation (ASX:OGC) has provided its Q1 2020 presentation for the period ended 31 March 2020.
- Gold production during the quarter was 80.7 koz. The production decreased QoQ on lower grades.
- Material mined improved QoQ with higher waste movements ahead of lower strip second half.
- Gold sales which was 107.3 koz in Q42019 dropped to 91.4 koz in Q1 2020.
- Productivity improvements noted at Haile. Thus, reduced mining unit costs.