Sponsored

Tempest Minerals shares drilling update from Meleya Project

October 28, 2022 03:33 PM AEDT | By Manisha
Follow us on Google News: https://kalkinemedia.com/resources/assets/public/images/google-news.webp

Highlights

  • As per Tempest Minerals it’s Meleya Project stands out as Australia’s one of the most exciting base and precious metal exploration opportunities today.
  • The project is part of the Yalgoo Greenstone Belt with outcropping supracrustal mafic and felsic ‘greenstone’ units present around some felsic to intermediate intrusions.
  • TEM has been actively exploring at its 100% owned Meleya Project that has dozens of drill ready geological targets.
  • Presently, drilling on its Clover target at the project site is one of the focus areas of the company.

Australia-based mineral exploration company, Tempest Minerals Limited (ASX:TEM) has released an update today detailing how the continued drilling is advancing at the Meleya Project.

The Meleya Project, part of Tempest Minerals’ flagship Yalgoo Portfolio, represents one of the most exciting greenfield projects in the industry today. It stretches over a footprint of over 900km2. Together with the state government co-funded (EIS) 2 program, the first two 1 holes were drilled earlier this year to have stratigraphic controls at the Orion Target. Both drill holes of approximately 1,730.5m had numerous zones of strong alteration and visual mineralisation.

Image Source: TEM ASX Announcement

Status of drilling program at Clover Target

At present, Tempest is focusing on drilling at its Clover target. A diamond hole (637.1m) WARDH75 has been completed with thick sequences of highly altered mafic geology and minor sulphides observed throughout the hole. A parallel RC program of up to 4,000m has begun testing the multi kilometre thickness and structures within a possibly demagnetised zone.

TEM is anticipating that this RC program will transition into a regional aircore and RC program of up to 13,000m designed to penetrate zones of cover and laterite weathering across the newly identified belt.

An overview of the Clover Target


Image source: ©2022 Kalkine Media®

Progress made so far in exploration at Meleya
TEM has been actively exploring at its 100% Meleya Project where there are dozens of drill ready geological targets.

➢ Orion target - 2 x diamond drillholes (1,730m) - DHEM survey complete
➢ Ktulu - Large scale geochemical sampling program commenced
➢ Master target - initial 1 hole reconnaissance drilling program completed at the Master Target
➢ Clover target - First drillhole WARDH75 complete (637.1m diamond) - ~4000m RC program commenced

As part of its next move, Tempest Minerals aims to complete Clover RC program, begin Regional AC program and continue the ongoing data acquisition, assessment and fieldwork including soil sampling.

TEM shares were trading at AU$0.028 apiece on 28 October 2022.


Disclaimer

The content, including but not limited to any articles, news, quotes, information, data, text, reports, ratings, opinions, images, photos, graphics, graphs, charts, animations and video (Content) is a service of Kalkine Media Pty Ltd (Kalkine Media, we or us), ACN 629 651 672 and is available for personal and non-commercial use only. The principal purpose of the Content is to educate and inform. The Content does not contain or imply any recommendation or opinion intended to influence your financial decisions and must not be relied upon by you as such. Some of the Content on this website may be sponsored/non-sponsored, as applicable, but is NOT a solicitation or recommendation to buy, sell or hold the stocks of the company(s) or engage in any investment activity under discussion. Kalkine Media is neither licensed nor qualified to provide investment advice through this platform. Users should make their own enquiries about any investments and Kalkine Media strongly suggests the users to seek advice from a financial adviser, stockbroker or other professional (including taxation and legal advice), as necessary. Kalkine Media hereby disclaims any and all the liabilities to any user for any direct, indirect, implied, punitive, special, incidental or other consequential damages arising from any use of the Content on this website, which is provided without warranties. The views expressed in the Content by the guests, if any, are their own and do not necessarily represent the views or opinions of Kalkine Media. Some of the images/music that may be used on this website are copyright to their respective owner(s). Kalkine Media does not claim ownership of any of the pictures displayed/music used on this website unless stated otherwise. The images/music that may be used on this website are taken from various sources on the internet, including paid subscriptions or are believed to be in public domain. We have used reasonable efforts to accredit the source wherever it was indicated as or found to be necessary.

Two ASX Listed Stocks Giving Bullish Indications

Recent Articles

Investing Tips

Previous Next
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.