Silicon Metals Corp. Commences 2025 Field Work and Reports High Purity Results

June 04, 2025 07:00 PM AEST | By News File Corp
 Silicon Metals Corp. Commences 2025 Field Work and Reports High Purity Results
Image source: Kalkine Media

Vancouver, British Columbia--(Newsfile Corp. - June 4, 2025) - SILICON METALS CORP. (CSE: SI) (FSE: X6U) (OTC Pink: SLCNF) ("Silicon Metals" or the "Company") is pleased to announce the start of fieldwork at its Ptarmigan Project (the "Project" or the "Property), located ~130 km from Prince George, BC, following promising Q4 2024 high-purity sampling results.

The Company recently completed a high-definition airborne LiDAR survey, conducted by McElhanney Ltd., to generate a 3D topographic model of the Property. This will support modeling of the high-purity quartzite formations, which appear as prominent northwest-southeast trending ridges.

In late 2024, 225 samples (184 quartzite and 41 country rock) were collected and analyzed by Bureau Veritas. Results showed:

  • 48% of quartzite samples exceeded 99% SiO₂

  • 8% exceeded 99.9% SiO₂

  • Average purity: 98.49% SiO₂

Main impurities included Al₂O₃ (0.84%), Fe₂O₃ (0.33%), K₂O (0.17%), and TiO₂ (0.10%). Samples were prepared using ceramic pulverisers and analyzed via XRF fusion to minimize contamination, though some metal traces from tools are expected. The reader is cautioned that grab samples are selected samples and may not represent true underlying mineralization.

COO Raymond Wladichuk, stated: "We're excited to build on 2024's success. With a stronger technical team and strategic plan, we're ready to advance the Ptarmigan Project."

Procedures

Rock grab, chip, and channel samples were collected from in-situ outcrops. Channel samples were cut using a handheld masonry saw with a diamond blade and were collected in 2 meter intervals for a total of 24 meters across two separate channel cuts. Chip samples were taken from an exposed bluff in a quarry and were collected in 5 meter intervals for a total of 30 contiguous meters. Samples were placed in poly ore bags with unique sample IDs and sealed with zip ties. Rock descriptions, sample location, and sample details were recorded for each sample. Samples were shipped to Bureau Veritas labs in Vancouver, BC, an independent certified laboratory, via Bandstra Transportation Systems; in-house chain of custody and sample security measures were implemented for all sample shipments. Samples were crushed until 70% passed through 10 mesh and a further 250 grams was pulverized (PRP70-250). Pulverized material was analyzed via X-ray fluorescence on a fused disc with Si02 detection limits of 0.01%

Qualified Persons

Jeremy Hanson, P. Geo., a Qualified Person as that term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), has reviewed and approved the technical aspects of this news release. Mr. Hanson, P.Geo., is independent of Silicon Metals Corp.

Raymond Wladichuk, P.Geo., a Qualified Person as that term is defined under NI 43-101, has also reviewed and approved the technical aspects of this news release. Mr. Wladichuk, P. Geo., is the COO and Director of Silicon Metals Corp.

For further information on the Ptarmigan Silica project, please see the Company's technical report titled "Ptarmigan Silica Project Cariboo Mining Division NTS 093/H10 and 11 British Columbia, Canada NI 43-101 Technical Report" with an effective date of September 26, 2024 and filed on October 1, 2024 by Chris M. Healey, P. Geo Principal Geologist, Healex Consulting Ltd Engineers and Geoscientists British Columbia Member, which is available under the Company's profile on SEDAR+ at www.sedarplus.ca.

About Silicon Metals Corp.

Silicon Metals Corp. is currently focused on exploration in western Canada, namely British Columbia. The Company holds an undivided 100% right, title and interest in the Ptarmigan Silica Project located approximately 130km from Prince George, British Columbia. The Company has also acquired an option to purchase an undivided 100% right, title, and interest in both the Silica Ridge Silica Project located approximately 70kms southeast from the town of MacKenzie, British Columbia, as well as the Longworth Silica Project located approximately 85km East from Prince George, British Columbia.

ON BEHALF OF THE BOARD OF DIRECTORS OF

SILICON METALS CORP.

"Morgan Good"

Morgan Good
Chief Executive Officer and Director

For more information regarding this news release, please contact:

Morgan Good, CEO and Director

Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the CSE accepts responsibility for the adequacy or accuracy of this release).

Cautionary Note Regarding Forward-Looking Statements

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements relating to: the Company's future exploration plans with respect to the Ptarmigan Silica Project. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this news release. Readers are cautioned that the foregoing list of factors is not exhaustive.

In making the forward-looking statements in this news release, the Company has applied certain material assumptions, including without limitation, that the Company's future exploration plans with respect to the Ptarmigan Silica Project will remain unchanged; and that the Company's operations and ability to complete its exploration plans will not be adversely impacted by global events and changes in the global economy.

These forward‐looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things, that the Company may not be able to carry out its future exploration plans with respect to the Ptarmigan Silica Project.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/254397


Disclaimer

The content, including but not limited to any articles, news, quotes, information, data, text, reports, ratings, opinions, images, photos, graphics, graphs, charts, animations and video (Content) is a service of Kalkine Media Pty Ltd (“Kalkine Media, we or us”), ACN 629 651 672 and is available for personal and non-commercial use only. The principal purpose of the Content is to educate and inform. The Content does not contain or imply any recommendation or opinion intended to influence your financial decisions and must not be relied upon by you as such. Some of the Content on this website may be sponsored/non-sponsored, as applicable, but is NOT a solicitation or recommendation to buy, sell or hold the stocks of the company(s) or engage in any investment activity under discussion. Kalkine Media is neither licensed nor qualified to provide investment advice through this platform. Users should make their own enquiries about any investments and Kalkine Media strongly suggests the users to seek advice from a financial adviser, stockbroker or other professional (including taxation and legal advice), as necessary.
The content published on Kalkine Media also includes feeds sourced from third-party providers. Kalkine does not assert any ownership rights over the content provided by these third-party sources. The inclusion of such feeds on the Website is for informational purposes only. Kalkine does not guarantee the accuracy, completeness, or reliability of the content obtained from third-party feeds. Furthermore, Kalkine Media shall not be held liable for any errors, omissions, or inaccuracies in the content obtained from third-party feeds, nor for any damages or losses arising from the use of such content.
Kalkine Media hereby disclaims any and all the liabilities to any user for any direct, indirect, implied, punitive, special, incidental or other consequential damages arising from any use of the Content on this website, which is provided without warranties. The views expressed in the Content by the guests, if any, are their own and do not necessarily represent the views or opinions of Kalkine Media. Some of the images/music that may be used on this website are copyrighted to their respective owner(s). Kalkine Media does not claim ownership of any of the pictures displayed/music used on this website unless stated otherwise. The images/music that may be used on this website are taken from various sources on the internet, including paid subscriptions or are believed to be in public domain. We have made reasonable efforts to accredit the source wherever it was indicated as or found to be necessary.
This disclaimer is subject to change without notice. Users are advised to review this disclaimer periodically for any updates or modifications.


AU_advertise

Advertise your brand on Kalkine Media

Sponsored Articles


Investing Ideas

Previous Next
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.